Skip to main content
Silveira Drypack

Gallery

The work speaks before the tile goes down.

Real floors, shower bases, scratch coats and membrane installations documented on site. These are the layers that disappear, shown before they are covered.

Photo record

Built, checked, documented.

Finished substrates, transitions, drains and full-floor installations from real jobs.

Large outdoor mortar bed completed across a covered stone terrace
Large-format outdoor mortar bed
Fresh mortar bed finished across a bright open room with patio doors
Full-room mortar bed brought to plane
Scratch coat prepared across a bathroom floor and shower base around multiple drains
Bathroom and shower preparation around drains
Scratch coat keyed across a bathroom floor around plumbing rough-ins
Keyed bathroom floor around rough-ins
Compact shower base packed flat within metal edging
Compact shower base preparation
Blue uncoupling membrane installed across a bathroom floor before finishing
Continuous membrane coverage in a bathroom
Large drypack mortar floor freshly screeded through an open home interior
Full-floor drypack across an open interior
Fresh scratch coat prepared across a bathroom floor in front of a freestanding tub
Fresh scratch coat, keyed and ready for the next layer
Mortar substrate floated flat between framed walls and cement board
Previous scratch coat project
Large drypack mortar floor screeded flat across an open room
Drypack brought to a consistent plane
Shower base packed with drypack mortar around a centre drain
Consistent fall shaped to the drain
Finished shower drypack base with clean edges and centre drain
Shower base ready for the next trade
Waterproofing membrane sheets bonded across a prepared bathroom floor
Membrane over a prepared floor
Bathroom floor mortar bed finished flat around the drain and rough-in
Bathroom floor bed around rough-ins
Laundry room mortar bed screeded flat around plumbing rough-ins
Flat drypack around plumbing rough-ins
Entry floor levelled with mortar up to a doorway transition
Clean elevations at doorways
Membrane coverage across an entry and hallway floor
Continuous membrane coverage

Site walkthroughs

Walk the finished work.

Freshly screeded drypack floor in a framed new build
Level mortar bed around partitions and rough-ins
Drypack floor completed through a bright open room
Large-scale drypack installation across a detailed interior

Request a Quote

Planning a shower or substrate build?

Send the project details and we will come back to you about scope, sequencing and scheduling.